This past spring, our move to South Lake Union seemed an eternity away. We’ve been pouring over finishes and mapping out seating arrangements, but the space has remained a blank slate until now. Construction has begun at 801 Blanchard, and this transition is starting to feel real. Take a look at these photos of our progress!
The Team
- Architect: nbbj
- Construction: Foushée
- Project Management: Bloom Projects, LLC
![Hallway](https://kinzerpartners.wpenginepowered.com/wp-content/uploads/2015/09/2.Hallway-225x300.jpg)
![HVAC](https://kinzerpartners.wpenginepowered.com/wp-content/uploads/2015/09/2.HVAC_-225x300.jpg)
![Fire sprinklers installed.](https://kinzerpartners.wpenginepowered.com/wp-content/uploads/2015/09/Sprinklers-225x300.jpg)
![Entry wall framed for signage.](https://kinzerpartners.wpenginepowered.com/wp-content/uploads/2015/09/Signage-225x300.jpg)
![Backing installed for monitors and other hung furnishings.](https://kinzerpartners.wpenginepowered.com/wp-content/uploads/2015/09/Backing-225x300.jpg)
![Electrical wall rough](https://kinzerpartners.wpenginepowered.com/wp-content/uploads/2015/09/Electrical-225x300.jpg)
![Drywall](https://kinzerpartners.wpenginepowered.com/wp-content/uploads/2015/09/2.Drywall-300x225.jpg)
![Seismic Bracing](https://kinzerpartners.wpenginepowered.com/wp-content/uploads/2015/09/2.Seismic-Bracing-300x225.jpg)